Prescolite ARCHITRAK SYSTEM AKTEF - Live End Feed User Manual

Browse online or download User Manual for Lighting Prescolite ARCHITRAK SYSTEM AKTEF - Live End Feed. Prescolite ARCHITRAK SYSTEM AKTEF - Live End Feed User Manual

  • Download
  • Add to my manuals
  • Print
  • Page
    / 1
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 0
InstructionSheet
www.prescolite.com • Prescolite TollFree Technical Support 1.888.PRS.4TEC • Hours: 8am - 5pm ET
101 Corporate Drive • Spartanburg, SC 29303
With representatives offices in principal cities throughout North America.
Copyright 2005, 08/05 revision, All Rights Reserved - Printed in U.S.A.
Part No. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .157780100
InstructionSheet
INSTALLATION INSTRUCTIONS
FOR AKTEF LIVE END FEED.
FOR USE WITH PRESCOLITE AKT ONE/TWO CIRCUIT TRACK SYSTEM ONLY.
READ INSTALLATION INSTRUCTIONS BEFORE INSTALLING THE TRACK SYSTEM
SAVE INSTRUCTIONS FOR REFERENCE WHEN MAKING ADDITIONS TO OR CHANGES
IN THE TRACK SYSTEM CONFIGURATION.
INSTALLATION
1. Refer to PRESCOLITE AKT series track for track installation instructions
2. Loosen retaining screw at ends of connector.
3. Remove plastic cover from feed connector. Remove 7/8 Dia. Ko.
4. Align live end feed with pre-mounted track rail. Insert and press together.
5. For supply wire connection use approved 1/2” conduit connector.
6. For single circuit operation connect black wire (HOT) to brass terminal L-1. Connect white wire (NEUTRAL) to nickel
terminal N-1. Connect ground wire to green ground screw. For two wire circuits see wiring diagrams below.
7. Replace plastic cover.
L-2
GREEN GROUND SCREW
N-1
IMPORTANT SAFETY INFORMATION. READ AND FOLLOW ALL SAFETY INSTRUCTIONS. Follow label information
and instructions concerning Wet or Damp Locations, installation near combustible materials, insulation, building materials,
and proper lamping. Do not install in areas subject to combustible vapors or gases. Before wiring to power supply and
during servicing or relamping, turn off power at fuse or circuit breaker. All servicing or relamping must be performed by
qualified service personnel. Product must be grounded to avoid potential electric shock or other potential hazard.
Product must be mounted in locations and at heights and in a manner consistent with its intended use, and in
compliance with the National Electrical Code and local codes. The use of accessory equipment not recommended by
the manufacturer or installed contrary to instructions may cause an unsafe condition. Do not block light emanating from
product in whole or part, as this may cause an unsafe condition. Do not allow items such as drapes, curtains, screens or
the like to come into contact with the product or to block light from the product, as this may cause an unsafe condition.
INSTALLATION INSTRUCTIONS
ARCHITRAK
®
SYSTEM
N-1
L-1
L-2
RETAINING SCREW
N-2
L-1
N-2
WHEN WIRED IN THIS
CONFIGURATION ONE
SET OF BUSS BARS
WILL NOT BE ENERGIZED
L-1
BLACK (HOT) WIRE
WHITE (NEUTRAL) WIRE
GREEN GROUND SCREW
N-1
WIRE DIAGRAM 1-CIRCUIT
WIRE HOT WIRE TO L-1
NEUTRAL TO N-1, CONNECT
GROUND WIRE TO GROUND
SCREW..
WIRE DIAGRAM 1-CIRCUIT
WIRED FOR 2-CIRCUITS.
WIRE HOT WIRE TO L-1,
NEUTRAL TO N-1. BLACK
JUMPER WIRE TO L-1 AND
L-2, WHITE JUMPER WIRE
TO N-1 AND N-2. CONNECT
GROUND WIRE TO GROUND
SCREW.
WIRE DIAGRAM 2-CIRCUITS
CIRCUIT 1 WIRE HOT WIRE
TO L-1 NEUTRAL WIRE TO N-1
GROUND WIRE TO GROUND
TERMINAL.
CIRCUIT 2 WIRE HOT WIRE
TO L-2 NEUTRAL WIRE TO N-2
GROUND WIRE TO GROUND
TERMINAL.
NOTE: L-1, L-2 BRASS COLORED TERMINAL
N-1, N-2 NICKEL COLORED TERMINAL
JUMPER WIRES USE 12 GA.
STRANGED, UL/CSA LISTED
90 DEGREE WIRE.
Page view 0
1

Summary of Contents

Page 1 - InstructionSheet

InstructionSheetwww.prescolite.com • Prescolite TollFree Technical Support 1.888.PRS.4TEC • Hours: 8am - 5pm ET101 Corporate Drive • Sparta

Comments to this Manuals

No comments